TxDOT will begin a project the first week of February to make routine repairs to the US 180 bridge where it joins with SH 351 in Shackelford County.
 The bridge will remain open throughout the project, but the traffic lane will be narrowed. During construction, an advisory speed limit of 45 mph will be posted, and no oversize/overweight loads will be permitted. Drivers should use extreme caution in the construction zone and watch for workers in the area.
 O. Trevino Construction LLC of Roanoke, Texas will complete the project for about $308,000. Work is expected to be completed this spring